Why we detail stone before we detail steel

Material decisions made early keep a building honest for decades.
Written by Acute Innovation SA
Location of Project

Stone sets the module. Once the coursing and the joint width are fixed, the
openings, the sill heights and the floor-to-floor dimension all follow from it,
and the steel can be sized to suit. Reversing that order means cutting stone to
fit a frame that was never dimensioned for it.

The saving is not in the material but in the drawings. A wall that resolves on
the module needs fewer special pieces, fewer site decisions and fewer of the
small compromises that accumulate into a building that reads as approximate.

Project referenced
Detail view of a sharp cantilevered roof edge in black and white, with clean geometric lines set against a plain sky and softened by foliage below.
House Mothibe
Private Residence · Status TBC
Share

More stories

House Mothibe: two slabs and the gap between them

A flat site gave the house no horizon to work with, so it made its own. How two offset floor plates ended up doing the shading, the framing and the arrival.

House Mothibe: first slab poured

A monthly record of the Polokwane commercial build as it rises.

Designing for the Limpopo sun

Eaves, orientation and thermal mass, tested across four residential projects.